Works

Works schedule

Below you can consult the planned dates for the most important works on each area of the Vigo campus, as well as the works on the Ourense and Pontevedra campuses:

Vigo CampusÌý

Vista aérea do campus de Vigo

Ourense Campus

Vista do campus de Ourense

Pontevedra Campus

Vista aérea do campus de Pontevedra

Ìý

Sustainable construction

Through collaboration between the Department of Works and Infrastructure, the Technical Unit, and the Environment Office, the Âé¶¹¹û¶³ is working to achieve sustainable and renewable buildings through the following actions:

  • Studying the possibility of installing renewable energy systems
  • Advancing in the establishment of centralised heating systemsÌý
  • Establishing collaborations with the relevant administrations

To promote sustainable mobility, the Âé¶¹¹û¶³ carried out the installation of electric vehicle charging stations on the campuses of Ourense, Pontevedra and Vigo.

These actions are part of the 2025 subsidies for electric mobility (MOVES III Programme in Galicia) – IN421Q, IN421R.

The Âé¶¹¹û¶³ has carried out various projects subsidised by incentive programmes 4 and 5 of RD 477/2021, related to self-consumption and storage in the residential sector, with public administrations and with the third sector within the framework of the European Recovery, Transformation and Resilience Plan (IN422J and IN422K).

The eligible cost of the operation amounts to €863,806.90 and is financed by the European Union-NextGenerationEU.

The Âé¶¹¹û¶³ carried out various projects within the aid line for low-carbon economy projects, in electricity generation facilities using renewable energy sources, co-financed by the European Regional Development Fund (ERDF) and managed by the IDAE, aimed at achieving a cleaner and more sustainable economy.Ìý

The total investment amounts to €338,232.41 and the total amount of aid is €260,634.20.

With the aim of promoting sustainable mobility, the Âé¶¹¹û¶³ carried out work to install electric vehicle charging stations on the Ourense and Pontevedra campuses.Ìý

These actions are part of the 2020 State Programme of Incentives for Efficient and Sustainable Mobility (MOVES II Programme), co-financed by the European Union within the Galicia 2014-2020 ERDF Operational Programme.

As an example of this commitment, in 2020 the Âé¶¹¹û¶³ carried out various renewable thermal energy projects and comprehensive energy saving and efficiency projects on the Vigo campus. These actions were financed by the European Regional Development Fund within the framework of the Feder Galicia 2014/2020 operational programme.

In 2019, the Âé¶¹¹û¶³ installed six solar photovoltaic systems for self-consumption on its campuses in Vigo, Ourense and Pontevedra. These actions were financed by the European Regional Development Fund within the framework of the Feder Galicia 2014/2020 operational programme.

Ìý